0086 15505412086

0086 531 88767927 

COPYRIGHT © Jinan Qihui Beer Equipment Co., Ltd:鲁ICP备18020678号 Powered by www.300.cn

2000L beer equipment Finish installation and Brewing Beer Today

Author:
Anna
2019/10/18 17:11

2000L beer brewing equipment finished installation and start brewing today

No.

System

Equipments components

Specification

Quantity

1

 

Milling system

 

Malt miller

500kgs/H

1

Flexible auger system

500kgs/H

1

2

 

 

 

 

 

 

 

 

 

 

Mashing system
(Steam heating)

 

 

 

 

 

 

 

 

 

 

 Mash/lauter tank

2000L

1

Kettle/whirlpool tank

2000L

1

Hot liquid tank

2000L

1

Grist hydrator

Assorted

1

 Centrifugal Mash pump

5T/H

2

Hops filter tank

50L

1

Wort balance pipeline

Assorted

1

Plate heat exchanger

20㎡

1

Wort food hose

Lanshell

Assorted

Pipeline valve

Assorted

Assorted

Work platform SUS304

Assorted

Assorted

3

 

Fermenting system

 

Fermenter

2000L

4

Yeast adding tank

20L

1

4

 

 

 

Cooling system

 

 

 

Glycol liquid tank

4000L

1

Kansa Chiller

10HP

2

Glycol liquid pump

8T/H

1

Glycol liquid pipeline

Assorted

Assorted

5

Control system

Control cabine(CE)

Digital control

1

6

 

 

 

Movable CIP system

 

 

 

Alkali tank

200L

1

Sterilization tank

200L

1

CIP control cabinet

PID control

1

 CIP pump+pipeline valve

Assorted

1

7

Accessories

Spare parts (Extra)

Assorted

1

8

 

Steam system

 

Steam generator

200KG/H

1

Steam pipeline and valve

Assorted

1